Playground Safety Inspection Report

Report No. SC-SAMPLE-001 · Comprehensive CPSI Audit

Site & Inspection Details

ClientOakview Community HOA
SiteNeighborhood Park Playground
Location1234 Main St
Inspection DateSample Date
Equipment1 composite structure (ages 5–12), 4-bay swing set, freestanding climber
SurfacingEngineered wood fiber (EWF)
Standards ReferencedCPSC Public Playground Safety Handbook, ASTM F1487, ASTM F1292, ADA
InspectorPetros Papageorge, CPSI
f6

Summary of Findings

2
Priority 1 — Fix Immediately
2
Priority 2 — Fix Within 30 Days
1
Priority 3 — Routine Maintenance
38
Items Checked & Passed

Overall the playground is in fair condition. Two items could cause serious injury and should be addressed, or the affected equipment closed, before the next day of use. The remaining items are wear-related and can be scheduled.

Photo-Documented Findings

f1
PRIORITY 1Swing Set · Bay 2

Open S-hook at swing hanger

Issue: S-hook gap exceeds 0.04 in. — an entanglement and chain-separation hazard.

Recommended Action: Remove swing from service. Replace or close S-hook with manufacturer-approved hardware.

 

f5
PRIORITY 1Use Zone Border · NE Corner

Exposed rebar spike at border timber

Issue: Rotted timber has exposed a protruding rebar stake inside the use zone — impalement and tripping hazard.

Recommended Action: Cut rebar flush or remove; replace deteriorated border section.

 

f2
PRIORITY 2Surfacing · Slide Exit Zone

Displaced surfacing below required depth

Issue: EWF measured at 4 in. at slide exit; 9–12 in. is required for the 6 ft fall height.

Recommended Action: Top off and rake surfacing to 12 in.; consider wear mats at high-traffic exits.

 

f3
PRIORITY 2Composite Structure · Deck 1

Protruding bolt end

Issue: Bolt extends beyond nut by more than two threads, failing the protrusion gauge test.

Recommended Action: Trim bolt and install manufacturer cap nut.

 

f4
PRIORITY 3Composite Structure · Tube/Wave Slide

Crack forming in slide side wall

Issue: Early-stage crack and UV fading on lower slide wall; no sharp edge yet.

Recommended Action: Monitor monthly; budget for replacement slide section within 12 months.

 

Repair Priority Action Plan

#ItemPriorityTimeframeResponsible
1Replace open S-hook, Swing Bay 2P1ImmediatelyMaintenance
2Remove rebar / replace border timberP1ImmediatelyMaintenance
3Restore EWF surfacing to 12 in.P2Within 30 daysVendor
4Trim bolt, install cap nutP2Within 30 daysMaintenance
5Monitor / budget slide replacementP3Within 12 monthsBoard / Budget

How We Rank Priorities

PRIORITY 1Could cause serious injury. Close equipment or repair before next use.

PRIORITY 2Could cause minor-to-moderate injury. Repair within 30 days.

PRIORITY 3Wear or maintenance item. Monitor and address in routine maintenance.

Every Report Includes

  • Site and equipment inventory
  • Surfacing depth and use-zone review
  • Hardware, protrusion, and entrapment checks
  • ADA accessibility notes
  • Dated photos of every finding
  • Prioritized repair action plan
  • Standards references for each item
  • Signed CPSI documentation for your records
Inspector: Petros Papageorge, Certified Playground Safety Inspector (CPSI)