See What You Get
Every SafeCheck inspection comes with a clear, photo-documented report that ranks each issue by urgency, so you know exactly what to fix first and can keep it on file for insurance and liability records.

Playground Safety Inspection Report
Site & Inspection Details

Summary of Findings
Overall the playground is in fair condition. Two items could cause serious injury and should be addressed, or the affected equipment closed, before the next day of use. The remaining items are wear-related and can be scheduled.
Photo-Documented Findings

Open S-hook at swing hanger
Issue: S-hook gap exceeds 0.04 in. — an entanglement and chain-separation hazard.
Recommended Action: Remove swing from service. Replace or close S-hook with manufacturer-approved hardware.

Exposed rebar spike at border timber
Issue: Rotted timber has exposed a protruding rebar stake inside the use zone — impalement and tripping hazard.
Recommended Action: Cut rebar flush or remove; replace deteriorated border section.

Displaced surfacing below required depth
Issue: EWF measured at 4 in. at slide exit; 9–12 in. is required for the 6 ft fall height.
Recommended Action: Top off and rake surfacing to 12 in.; consider wear mats at high-traffic exits.

Protruding bolt end
Issue: Bolt extends beyond nut by more than two threads, failing the protrusion gauge test.
Recommended Action: Trim bolt and install manufacturer cap nut.

Crack forming in slide side wall
Issue: Early-stage crack and UV fading on lower slide wall; no sharp edge yet.
Recommended Action: Monitor monthly; budget for replacement slide section within 12 months.
Repair Priority Action Plan
| # | Item | Priority | Timeframe | Responsible |
|---|---|---|---|---|
| 1 | Replace open S-hook, Swing Bay 2 | P1 | Immediately | Maintenance |
| 2 | Remove rebar / replace border timber | P1 | Immediately | Maintenance |
| 3 | Restore EWF surfacing to 12 in. | P2 | Within 30 days | Vendor |
| 4 | Trim bolt, install cap nut | P2 | Within 30 days | Maintenance |
| 5 | Monitor / budget slide replacement | P3 | Within 12 months | Board / Budget |
How We Rank Priorities
PRIORITY 1Could cause serious injury. Close equipment or repair before next use.
PRIORITY 2Could cause minor-to-moderate injury. Repair within 30 days.
PRIORITY 3Wear or maintenance item. Monitor and address in routine maintenance.
Every Report Includes
- Site and equipment inventory
- Surfacing depth and use-zone review
- Hardware, protrusion, and entrapment checks
- ADA accessibility notes
- Dated photos of every finding
- Prioritized repair action plan
- Standards references for each item
- Signed CPSI documentation for your records